Power Planning

Size utility feed, generators, UPS and PDUs against IT load, PUE and redundancy class.

Inputs
Adjust to model power topology for this site.
10.00
1.40
Utility feed
15.40 MW
Facility × 1.1 margin
Installed
28.00 MW
2N × facility
Generators
12 × 2.5 MW
To cover installed
UPS energy
3333 kWh
10 min @ 20.00 MW
Power stack (MW)
From IT load up to redundant installed capacity.